UNCLOGPRO

OFFICES & BUSINESS PROPERTIES

Keep condensate-line work out of the workday.

Unclog helps office facilities teams turn compatible drain-line care into a scheduled building standard—before a repeat cleanout becomes a tenant issue, room closure or urgent service ticket.

TENANT COMFORT BUSINESS-HOUR ACCESS FINISHED SPACES PORTFOLIO STANDARDS

THE OPERATIONS BRIEF

A small drain-line problem can create a very visible workday.

Office properties concentrate people, technology and finished space into tightly scheduled buildings. Reactive condensate work competes with meetings, tenant access, security, cleaning, vendors and the rest of the facilities plan.

OPERATING CONCERNWHAT THE BUILDING EXPERIENCESTHE FACILITIES RESPONSE
Tenant disruptionAccess, noise and cleanup inside occupied suites or shared areas.Move compatible lines toward scheduled recurring care.
Room downtimeA conference room, office or amenity may be unavailable during response.Prioritize repeat-problem equipment in the pilot.
Finished & equipment spacesWater exposure near ceilings, furnishings, electronics or rooms below.Review placement, discharge and line conditions before installation.
Repeat ticketsThe same cleanout returns to the work queue again and again.Automate recurring suction where the system is compatible.
02

BY FLOOR. BY TENANT. BY LINE.

One building does not mean one condensate system.

Each compatible independent gravity line is reviewed on its own. Equipment, routing, access, elevation, power and discharge determine the appropriate installation—not the building address alone.

Multi-tenant office building with four independent condensate lines and four real rectangular Unclog units
Illustrative office property. Actual compatibility and placement depend on the field conditions of each independent line.
  1. 04
    Tenant suitesOccupied offices, private rooms and open work areas
  2. 03
    Conference & amenitiesMeeting rooms, lounges and shared tenant spaces
  3. 02
    Lobby & common areasPublic-facing spaces with high visibility and finishes
  4. 01
    IT & building supportServer, engineering, administration and service areas

THE WORKDAY IS THE MAINTENANCE CONSTRAINT

Facilities work has to fit the building’s clock.

There may be quieter hours, but multi-tenant properties rarely have a universal maintenance window. Scheduled line care helps reduce dependence on emergency access during the busiest part of the day.

OpeningSecurity, engineering and early occupants arrive.
Arrival peakLobbies, elevators and tenant suites fill quickly.
Occupied dayMeetings, vendors and building operations overlap.
Evening shiftCleaning and scheduled service work begin.

CHANGE THE SERVICE-TICKET PATH

From repeat response to repeatable building care.

REACTIVETHE SAME LINE RETURNS
  1. Issue reportedComfort complaint, water or equipment shutdown
  2. Access coordinatedTenant, security and facilities schedules align
  3. Line clearedStaff or vendor performs another cleanout
  4. Ticket returnsThe repetitive task comes back to the queue
PLANNEDTHE STANDARD REPEATS
  1. Compatibility reviewedConfirm line, access, placement, power and discharge
  2. Installation documentedUse included fittings or a professional hard-plumbed connection
  3. Cycles scheduledConnected app or offline recurring operation
  4. Facilities time reclaimedStaff focus on work requiring judgment
03

A PROFESSIONAL BUILDING STANDARD

Install for the property—not for a diagram.

Each Unclog is placed at the accessible termination of a compatible independent gravity condensate line, below the primary drain-pan level.

Review a specific building
01

Confirm the systemIdentify the independent gravity line. Pumped drains and inaccessible terminations require review.

02

Confirm the siteReview elevation, weather, 110V power and an appropriate discharge location.

03

Choose the connectionUse the included collapsible hose and fittings or hard-plumb PVC directly to the side inlet.

04

Plan the outletThe side outlet can also be hard-plumbed; outdoor discharge may be appropriate where site conditions allow.

FROM ONE BUILDING TO THE PORTFOLIO

Turn field knowledge into an asset standard.

Start with the locations carrying the highest repeat-cleanout burden. Document what works, group similar equipment and routing, then expand in planned phases.

PHASEPORTFOLIO ACTIONFIELD OUTPUTSTATUS
01 / PILOTSelect high-burden linesRepeat tickets, costly access or sensitive spacesFirst-building scope START HERE
02 / DOCUMENTRecord the installation standardCompatibility, connection, power and dischargeAsset register DEFINE
03 / GROUPMatch similar building systemsEquipment, routing, access and operating profileRollout groups ORGANIZE
04 / EXPANDSchedule the next propertiesCoordinate with vacancies, projects and service windowsPortfolio phases SCALE

PRO-BACKED PRODUCT DETAILS

What belongs in the office facilities brief.

Compatible drain lines
Up to 1.5 in. for compatible commercial applications
Power
110V; 12 ft power cord included
Controls
App, offline scheduling and manual run
Cleaning method
Scheduled suction; no recurring chemical consumables
Professional warranty
3-year limited warranty, subject to terms
Submit Building Information
Unclog smart A/C condensate drain cleanerFACILITIES
STANDARD

OFFICE FACILITIES FAQ

Questions property teams ask first.

Does one Unclog cover an entire office building?

No. One Unclog serves one compatible independent gravity condensate line. A building review determines which lines are compatible and how many units are appropriate.

Can Unclog work in multi-tenant buildings?

Yes, when the individual system and installation conditions are compatible. The review considers equipment ownership, access, routing, power and discharge for each line.

Can installation be hard-plumbed?

Yes. PVC can be hard-plumbed directly to the side inlet for a permanent professional installation. The side outlet can also be hard-plumbed when required.

Can Unclog operate without building Wi-Fi?

Yes. Offline recurring operation is available in addition to connected app scheduling, and facilities staff can run a manual cycle on site.

Can we start with one tenant suite or building?

Yes. A focused pilot can confirm compatibility, document the property standard and inform a multi-building rollout.

READY TO OPEN THE FIRST BUILDING BRIEF?Start the office application

PLAN AN OFFICE PILOT

Let’s find the right first buildings.

Tell us about your office or business-property portfolio. We’ll follow up with the right compatibility review, pilot plan and volume conversation.

A direct facilities conversation. Your request goes directly to the Unclog team—not a residential checkout flow.
  • Compatibility review available
  • Pilot and volume conversations
  • Direct follow-up from Unclog